The nonprofit Portland Botanical Gardens has signed an agreement to purchase the 59-acre McCormick & Baxter Superfund site in North Portland for $1.195 million.
They made the agreement with the Oregon Department of Environmental Quality (DEQ) on May 19, 2026.
The nonprofit plans to develop gardens, 10 acres of public green space, a connection to the Willamette River Greenway Trail, public access to the Willamette River, and educational and research spaces at the site.


The agreement with DEQ includes conditions requiring:
• Portland Botanical Gardens must demonstrate at least $3 million in available funding within one year before DEQ will give final approval to acquisition of the property,
• Portland Botanical Gardens must pay DEQ $1.195 million upon acquisition of
the property to reimburse a portion of past cleanup costs,
• Long-term monitoring and protections for the cleanup remedy,
• Public access to green space and the Willamette River,
• Construction of the Willamette River Greenway Trail across the property,
• Habitat improvements and conservation of riverfront areas,
• Tribal and community engagement plans,
• A pest management plan and invasive species screening policy, and
• DEQ review and approval of development plans before construction.
“For decades, North Portland communities have carried the impacts of industrial contamination along the North Reach of the Willamette River,” said Christine Svetkovich, DEQ northwest region administrator.
“This agreement creates an opportunity to transform the property into a publicly accessible community asset while ensuring the cleanup remedy remains protective in the long term,” she said.
The McCormick & Baxter Creosoting Co. operated at the site as an industrial wood treatment facility from 1944 to 1991. Its operations contaminated the soil, groundwater and river sediment with wood-treating chemicals including dioxin. After the company declared bankruptcy in 1991, DEQ and the U.S. Environmental Protection Agency oversaw a more than $70 million cleanup of the property and adjacent river areas using taxpayer funds.
Cleanup was completed in 2005, which included the removal of contaminated surface soil and installation of a groundwater barrier wall, an upland soil cap and in-water sediment cap in the Willamette River to safely isolate remaining contamination. DEQ and EPA continue long-term monitoring and maintenance of the remedy.
Getting the Portland Botanical Gardens off the ground will require an estimated $6.5 million total for initial land purchase and startup costs. Long-term infrastructure and building expenses are projected to range from $10 million to over $100 million, according to a report in Willamette Week.
The nonprofit’s vision is to create a research and education focused botanical gardens in Oregon’s first conservatory. Plans include the state’s largest collection of native plants, its most comprehensive vocational and research program for climate resilience, and plant habitats and appropriate horticulture, all within a living laboratory.
See more details at ordeq.org/mccormick-baxter.

